Infrastructure
GRPV 55 000 m³ of gas
The park has a gas distribution system
KOS and VOC
Own treatment facilities on site
OVC with a capacity of 15 000 m³
The park has a water supply system
100 MW
Reserved for residents
Direct exit from M-4
Railway in the park